From February 1, 2027, selling a Spokane County property with a septic system means a transfer inspection, a report filed with the health district, and a fee — before closing. Here is the whole process, in order.
📞 Call (509) 463-4972Selling soon? We can schedule the inspection and make sure the filing lands on time.
Last reviewed: October 24, 2026
If your property is in Spokane County and uses an on-site sewage system (a septic system), Washington's rule — WAC 246-272A-0270(1)(k) — requires an inspection by a third-party inspector authorized by the local health officer when the property is transferred, starting February 1, 2027. In Spokane County, the local health district is the Spokane Regional Health District (SRHD), and it runs the process below. This checklist covers the Spokane County fringe we serve, including the Deer Park area. For the rule itself, see our guide to Washington's 2027 septic inspection rule.
SRHD can exempt a transfer by application in a few situations:
The inspection has to be recent (inside 12 months), the report has to reach SRHD before closing, and permitted providers get busy. Book the inspection early in the listing process — ideally as soon as the home goes on the market — so a recommended pumping or a missing as-built doesn't turn into a closing delay.
Stevens, Pend Oreille, and Ferry counties are under the Northeast Tri County Health District (NETCHD). Its transfer-inspection process is separate from SRHD's — confirm the steps, forms, and fees with NETCHD directly rather than assuming Spokane County's process applies. Idaho has no statewide transfer-inspection rule, though buyers and lenders in North Idaho often ask for an inspection before closing anyway.
The fastest way to reach us is by phone: (509) 463-4972. Prefer email? Write to contact@inlandnorthwestseptic.com with your town, what you need, and how urgent it is — that is all we need to get back to you with a price and a time window.
February 1, 2027. From that date, a property with an on-site sewage system in Spokane County needs an inspection by a third-party inspector authorized by the local health officer when the property is transferred, under WAC 246-272A-0270(1)(k).
The Spokane Regional Health District asks for a property-transfer inspection by a permitted O&M provider completed within the past 12 months. If the district already has evidence of a recent compliant inspection, the health officer may remove the transfer-inspection requirement.
The completed inspection report and the district fee, submitted to the Spokane Regional Health District before closing — the O&M provider who did the inspection handles the filing. Have the system's as-built drawing (or a site plan) ready to go with it, and pump the tank first if the inspection report recommends it.
Yes, by application to the Spokane Regional Health District: a system that was permitted and operational within the past 12 months; a system with an O&M inspection completed within the past 12 months; or a system that has been abandoned and the property connected to sewer.
Deer Park, Clayton & Springdale · Elk & Chattaroy · Colville & Kettle Falls · Chewelah & Loon Lake · Newport & Cusick · Sandpoint & Ponderay · Priest River · Bonners Ferry · Rathdrum, Athol & Spirit Lake
More guides: Washington's 2027 septic inspection rule for home sales · How much does septic pumping cost in Eastern WA & North Idaho? · How often should you pump your septic tank? · Signs your septic tank is full